Resources
Do I need a permit?
Most structural, electrical and plumbing work does. Your city decides, and we file it as part of the job.
How long does a kitchen take?
Design and ordering usually take longer than the building. We give you both schedules.
Can we live in the house during work?
Often, with a temporary kitchen and dust walls. We plan it with you.
How are changes priced?
In writing, before the work, with the effect on the schedule.