Do I need a permit?

Most structural, electrical and plumbing work does. Your city decides, and we file it as part of the job.

How long does a kitchen take?

Design and ordering usually take longer than the building. We give you both schedules.

Can we live in the house during work?

Often, with a temporary kitchen and dust walls. We plan it with you.

How are changes priced?

In writing, before the work, with the effect on the schedule.